If 4 people can stain a deck in 2 days, how many people would be required to stain the deck in only 1 day?

Respuesta :

juju3911
juju3911 juju3911
  • 10-05-2016
8 people could stain a deck in one day.
Answer Link
littlemojo101
littlemojo101 littlemojo101
  • 10-05-2016
the answer to this is 8
Answer Link

Otras preguntas

Dora insists on being put on the train even though she isn’t Jewish. Why do you think she does this? Do you agree with her decision? Given the same circumstance
A major goal of the cultural revolution in china during the 1960s was to
What was the Battle of Midway?
What would happen if an aluminum wire were dipped dipped into a solution of tin (II) sulfate?
Which of the following is a relatively new disease? a. polio b. smallpox c. West Nile virus d. all of the above
Help! Sales tax? I have no idea how to do this!!
Why did many former slaves enter into sharecropping contracts that were designed to keep them poor?
The Mute Swan is a species of bird with an orange-reddish bill and white feathers. It is naturally found in Europe and Asia but can sometimes be found in the Un
What would happen if cytokinesis occurred without mitosis?
Can someone pls give me a picture of a diagram of an ancient concrete block!? Pls no fake pics/answers!