The railway construction works commenced in Mombasa in 1896. By 1901, the railway had reached Kisumu (then Port Florence) passing through Nairobi in 1899.  The Nairobi –Thika Branch(1914), Konza – Magadi (1915), Voi- Moshi(1918), Rongai- Solai (1925), Eldoret-Kitale(1926), Eldoret- Jinja (1927), Gilgil-Nyahururu(1929), Thika- Nanyuki(1930) and Kisumu – Butere(1930)   In 1948, the Kenya Uganda Railway had been linked with the Tanganyika network to become the East African Railways.
Problems experienced during the construction of the Uganda railway. Â
a) There was insufficient labour since African labour force was not forthcoming. In the case of the Akamba and the Maasai, they were forcefully recruited. Â
b) The climate of the interior was not suitable for the European labour force. The Europeans constantly fell ill, thus interfering with construction progress.