imimperious2117 imimperious2117
  • 11-02-2021
  • Mathematics
contestada

Iii. A contractor hired 14 unskilled labourers to complete a job. It took 5 days for 20 men to complete the same job. How long will it take the hired labourers?

Respuesta :

sophia8833
sophia8833 sophia8833
  • 11-02-2021
The clock will tell you the time of how long it will take
Answer Link

Otras preguntas

If 1/a and a/2.23 are two real numbers included between 0 and 1, then a =
Light from two lasers is incident on an opaque barrier with a single slit of width 4.0 x 10-5 m. One laser emits light of wavelength 4.0 x 10-7 m and the other
A bakery sold a total of 380 cupcakes in a day, and 209 of them were mocha flavored. What percentage of cupcakes sold that day were mocha flavored? 1​
During the formation of water from hydrogen atoms and one oxygen
HELP PLEASE I ONLY HAVE A FEW MINS
Write a recursive rule for the sequence 10, 18, 26, 34….
describe how a study group might help you study better or learn more information
Zombies scare everyone and a mummy is much like a zombie. In fact, their equations are parallel to each other. If the zombie equation is `y=7x+5` and the mummy
How does pacing affect the characters in the story ?
which of these is an example of separation of powers? the president enforces a law passed by congress. representatives hold hearings to hear public opinion. rep