imimperious2117 imimperious2117
  • 11-02-2021
  • Mathematics
contestada

Iii. A contractor hired 14 unskilled labourers to complete a job. It took 5 days for 20 men to complete the same job. How long will it take the hired labourers?

Respuesta :

sophia8833
sophia8833 sophia8833
  • 11-02-2021
The clock will tell you the time of how long it will take
Answer Link

Otras preguntas

4(2h+g) can y’all tell me how to solve it please
Moles to grams 1_Mg + _2_HCI ---> _1_MgCl2 + _1_H2 What mass of HCl is consumed by the reaction of 1.25 moles of magnesium?
Kelly has a cherry tree in her yard. Currently the tree is 9 feet tall. That is 80% taller than it was when Kelly planted it. How tall was the tree then? feet
Uses energy to pump H+ across a membrane; energy is moved through a chain of proteins. please help​
2.3What does NBT stand for?​
In the diagram, the measure of angle 1 is 116°, the measure of angle 2 is (8x)°, and the measure of angle 6 is (x + 12)° What is the measure of angle 8, to the
While many Americans do recycle a fair amount of what they use, there is still one big barrier left to overcome in the struggle to reduce consumption and the am
A block is pulled 0.90 m to the right in 4.5 s. What is the block's average speed to the nearest tenth of m/s?
John Locke influence on today's government system can be seen in his idea of.​
Can u guys pls help me on this question and pls explain how u got the answer