if 9 men can complete a job in 4 days, how long will 8 men take to complete the same job, assuming that all the men are working at the same rate?

Respuesta :

irspow
irspow irspow
  • 12-03-2021

Answer:

Step-by-step explanation:

8t=9(4)

8t=36

t=4.5

So it will take 4.5 days for 8 men to finish the job.

Answer Link

Otras preguntas

8.8 Why do esters with higher molecular mass not have strong fragrances?​
There was a triangle ABC with sides 15, 20, and 10. One of the sides of a triangle, which is similiar to ABC is 60. What are the two other sides? Note: Give all
Which sentence most directly identifies an economic benefit of space exploration?
rational numbers between -5 and -6
If the center of a circle is (-5,8) and a point on the circle is (-5, -4) What is the radius?
Will mark brainliest & 50 points Infographics illustrate concepts or data so that people can better understand the information presented. If you had to desi
What is the molarity of NaCl in which AgCl has a molar solubility of 2.38 x 10-9 mol /L? The Ksp for Silver Chloride is: 1.83 x 10-10.
Two planes, which are 2920 miles apart, fly toward each other. Their speeds differ by 80mph. If they pass each other in 4 hours, what is the speed of each?
The knowledge about teaching and learning is referred to as:1. lecture knowledge 2. scaffolding knowledge3.reflective knowledge4. pedagogical content knowledge
Find the area of a circle with radius equal to 7π