The total overhead variance is the difference between actual overhead costs and overhead costs applied to work done.
a) true
b) false

Respuesta :

GIMMESLEEP
GIMMESLEEP GIMMESLEEP
  • 11-06-2021
The total overhead variance is the difference between actual overhead cost and overhead cost applied to work done is True
Answer Link

Otras preguntas

let f(x)=9x-2 and g(x)=-x+3. find f(g(x)).
what value of a makes the equation true? 9a+2=4a-18
3x+4y=17 solve for y.
When this car moves forward by 180 cm, each wheel does one full turn. What is the diameter of the wheels to the nearest centimetre?
If a 35 ft rope is cut into two sections with one section 6 times as long as the other section, how long is the shorter piece?
If a store credit account charges 1.5% interest each month, what is the APR?
Is the following correspondence a function
Choose the right variant 1 This book will take to years to write. A. After two years I'll write this book B. In two years time I'll have written this book C . A
what is the GCF of 12x and 44xy
what is the GCF of 12x and 44xy