joshuag3148 joshuag3148
  • 10-11-2017
  • Business
contestada

The main output of qualitative risk analysis is updating the

Respuesta :

meerkat18
meerkat18 meerkat18
  • 21-11-2017
The main output of qualitative risk analysis is updating the risk register with the probability, influence, score, and comments. Based on the scores and your urgency assessment, prioritize your threat. Some risks will demand further analysis, and those goes into the quantitative threat analysis process.
Answer Link

Otras preguntas

find the perimeter and diagonal of a square whose area is equal to the area of a rectangle whose length is 9m and breadth is 4m
Black bears have thick fur that traps air. How does this air insulate the bear in winter?
c+ax=dxthis one has all variables and no numbers
what is -15x=0 solution
a car moving at 25 m/s speeds up to 47m/s. it takes 9 seconds to do this.what is the acceleration of the car?
Lisa had a set of 12 toy cars. Then she gave her sister 3 cars. What fraction of Lisa’s set did Lisa give to her sister?
what is v/8=2 solution
Which type of country is most dependent on a ground transportation network for international trade?
What are two ways that every place on the earth can be located?
All life can be classified into three domains:__________,________ and ____________