tjacqueline2277 tjacqueline2277
  • 12-01-2018
  • Business
contestada

A good system of internal control requires that the job order cost sheet be destroyed as soon as the job is complete.
a. True
b. False

Respuesta :

jacintap21 jacintap21
  • 13-01-2018
a good system of internal control requires that the job order cost sheet be destroyed as soon as the job is B)False
Answer Link

Otras preguntas

Trevor paints 1/6 of the fence surrounding his farm each day. How many days will it take him to paint 3/4 of the fence?
Explain why a golf ball is heavier than a table-tennis ball even though the balls are the same size?
what is the best estimate for the sum of 3/8 and 1/12
Why is history open to ongoing and changing interpretations? a) Changing values limit interpretation. b) New evidence is not available. c) Primary sources are d
6. If 50 is 20% of a value, what is that value?
what is 135% as a fraction in simplest form
what is the expanded form of 0.334
What was the Trail of Tears?
what us the reciprocal of 7 1/3
242,628 written in word form